Ecosse Welding Ltd. had a job in downtown Calgary with the Salvation Army at the Hope Centre, installing new pipes for their new hot water system, and pressurizing it up to over 300psi. This will ensure there is enough hot water running throughout the building for all of its residences and employees to wash their hands in warm water, wash their laundry in hot water, and to take warm showers.
-
-
Ecosse Welding fabricated and installed piping in the Salvation Army Hope Centre in Calgary on Monday, May 2, 2016. They pressurized the pipes up today to over 300psi. (Photo by Adelle Ellis/ Adelle Ellis Photography)
-
-
Ecosse Welding fabricated and installed piping in the Salvation Army Hope Centre in Calgary on Monday, May 2, 2016. They pressurized the pipes up today to over 300psi. (Photo by Adelle Ellis/ Adelle Ellis Photography)
-
-
Ecosse Welding fabricated and installed piping in the Salvation Army Hope Centre in Calgary on Monday, May 2, 2016. They pressurized the pipes up today to over 300psi. (Photo by Adelle Ellis/ Adelle Ellis Photography)
-
-
Ecosse Welding fabricated and installed piping in the Salvation Army Hope Centre in Calgary on Monday, May 2, 2016. They pressurized the pipes up today to over 300psi. (Photo by Adelle Ellis/ Adelle Ellis Photography)
-
-
Ecosse Welding fabricated and installed piping in the Salvation Army Hope Centre in Calgary on Monday, May 2, 2016. They pressurized the pipes up today to over 300psi. (Photo by Adelle Ellis/ Adelle Ellis Photography)
-
-
Ecosse Welding fabricated and installed piping in the Salvation Army Hope Centre in Calgary on Monday, May 2, 2016. They pressurized the pipes up today to over 300psi. (Photo by Adelle Ellis/ Adelle Ellis Photography)